Metro Tunnel
-
Location
125-133 Swanston Street, Melbourne
-
Builder
CYP Joint Venture
M Squared Infrastructure was the contractor of choice for the Melbourne Metro Tunnel Project, working alongside Client CYP.
The $10.9 billion Metro Tunnel project will create nine kilometres of twin tunnels and five new underground stations at Arden, Parkville, CBD North, CBD South, and Domain, establishing a dedicated pathway for two of Melbourne’s busiest rail lines.
M Squared Electrical were appointed as the electrical contractor for the first package of the Metro Tunnel Early Works. The company was engaged by the principal contractor, John Holland, to assist with the design and implementation of both temporary and permanent power requirements for the two acoustic sheds located at Becket Street and Franklin Street in the CBD.
Our team played a key role in site establishment, tunnel boring machine (TBM) assembly and disassembly, TBM ancillary services installation, and machinery maintenance.
M Squared Electrical is staffing the site 24 hours a day with rotating shifts.
Read more
- All site establishment works which include all crib and site amenities,
- Installation and wiring of 2 x Herrenknecht Tunnel boring machines
- Tunnelling Industrial and potable water pump systems and controls
- Project wide site emergency lighting, site flood lighting to meet AS3012 requirements.
- Construction wiring throughout the tunnel sites and Tunnel including all underground lighting, evacuation system, Construction boards, Test and tagTunnelling site dewater system and water treatment plants
- Provide Shift maintenance technicians for support during tunnel excavation, assembly and disassembly of the Tunnelling machines.
Let me know if you need more info
M Squared Electrical is staffing the site 24 hours a day with rotating shifts.
Read more
- All site establishment works which include all crib and site amenities,
- Installation and wiring of 2 x Herrenknecht Tunnel boring machines
- Tunnelling Industrial and potable water pump systems and controls
- Project wide site emergency lighting, site flood lighting to meet AS3012 requirements.
- Construction wiring throughout the tunnel sites and Tunnel including all underground lighting, evacuation system, Construction boards, Test and tagTunnelling site dewater system and water treatment plants
- Provide Shift maintenance technicians for support during tunnel excavation, assembly and disassembly of the Tunnelling machines.
Let me know if you need more info
Assist with designing and implementing power requirements for the acoustic sheds.
Read more
- Site establishment works
- Coordination with overseas manufacturer
- Providing highly skilled technicians for launch Gantry machine assembly and build.
- Our experienced electricians were responsible for wiring, testing, and commissioning
- On going maintenance
Assist with designing and implementing power requirements for the acoustic sheds.
Read more
- Site establishment works
- Coordination with overseas manufacturer
- Providing highly skilled technicians for launch Gantry machine assembly and build.
- Our experienced electricians were responsible for wiring, testing, and commissioning
- On going maintenance