Westgate Tunnel
-
Location
2 Somerville Road, Yarraville
-
Builder
CPBJH Joint Venture
We've been providing skilled & experienced tunnelling foremen, leading hands, daywork, and rostered shift electricians for over 7 years.
M Squared Electrical has collaborated with CPB-JH on the West Gate Tunnel project, during which we have effectively carried out seven years of site setup, assembly, and disassembly of tunnel boring machines (TBMs).
Additionally, we have provided vital ancillary services associated with the installation and maintenance of TBMs.
Our contributions include supplying a proficient team comprising tunneling forepersons, leading hands, daywork electricians, and route electricians to bolster this significant infrastructure endeavor.
Expertise in underground electrical work
We understand the unique challenges of working underground—a dynamic environment that demands adaptability and technical expertise. Our electricians have extensive experience on major tunnelling projects across Australia, ensuring they bring the highest level of skill, safety, and efficiency to every project.
Delivering results in high-pressure environments
Large infrastructure projects operate on tight schedules and complex work environments. Our approach focuses on:
- Developing strategies to optimise workflow
- Providing innovative solutions to improve efficiency
- Deploying highly skilled shift workers and teams to meet critical timeframes
By maintaining a high standard of workmanship throughout the tunnel excavation and construction phase, we contribute to a safer, more efficient environment, minimizing faults and reducing project delays.
Previous projects have included the installation of permanent MEI cable ladder and conduit systems, deployment of site fibre, IT networks, and Wi-Fi systems, and the implementation of underground leaky feeder systems alongside the P25 Motorola emergency services radio network. Additional works have involved reinforcement and corbel casting for gantries, road deck plank installation, and the installation of drainage, fire, and dewatering systems.
Each project is designed with careful consideration of site-specific factors, ensuring efficiency, reliability, and seamless integration within the broader infrastructure.
Skilled and autonomous electricians
Our electricians are not only highly skilled but also capable of working autonomously, adapting to the evolving demands of tunneling projects. Their expertise covers a broad range of specialisations, including:
- Instrumentation & Variable Speed Drives (VSD)
- Programmable Logic Controllers (PLC) & Automation
- Data & Networking
- High Voltage Operations
- Electrical Over Hydraulic Controls
- Evacuation & Two-Way Communication Systems
- Environmental Sensors & Monitoring
- Permit Systems & Lockout/Tagout (LOTO)
- Pressurised Services & Control Systems
24/7 electrical support
As the registered electrical contractor for CPBJH, M Squared Infrastructure provided 24/7 shift electricians, ensuring continuous support and reliability throughout the project lifecycle.
At M Squared Infrastructure, we recognise that how a project is built is just as important as the final product. Our workmanship and professionalism reflect directly on our partners, clients, and stakeholders, reinforcing our commitment to excellence in tunnelling and infrastructure projects.
Our trained team has demonstrated expertise and built strong connections with partners, clients, and stakeholders.
Read more
The project has presented unique challenges, including operations in subterranean environments and the management of a diverse workforce.
Our team's expertise has been instrumental in overcoming these obstacles, significantly contributing to this landmark infrastructure effort. We take pride in our ability to execute large-scale projects while effectively mobilising teams capable of performing under rigorous conditions, ensuring that essential deadlines are consistently met.
We remain committed to upholding our professional standards and embodying our core values in every aspect of our operations.
Our trained team has demonstrated expertise and built strong connections with partners, clients, and stakeholders.
Read more
The project has presented unique challenges, including operations in subterranean environments and the management of a diverse workforce.
Our team's expertise has been instrumental in overcoming these obstacles, significantly contributing to this landmark infrastructure effort. We take pride in our ability to execute large-scale projects while effectively mobilising teams capable of performing under rigorous conditions, ensuring that essential deadlines are consistently met.
We remain committed to upholding our professional standards and embodying our core values in every aspect of our operations.
We have allocated electricians to this project to work on a 24/7 shift basis.
Read more
We have worked collaboratively on:
- All site establishment works which include all crib and site amenities, 300 person project office complex and community centre, 24,000 m2 spoil shed, bath house and laundry.
- Installation and wiring of 2 x 15meter Herrenknecht Tunnel boring machines
- 20 Mva of installed TBM power and 6 Mva of installed TBM services power
- Installation and management of site High Voltage reticulation systems
- 600m x1.8m dia pipejack drive Pipe jack and slurry plant assembly, disassembly and 24hr/7 day electrical shift maintenance.
- 6km Martitechnik Tunnel conveyor, loop take up and overland conveyor systems
- 3 x Eilbeck 500T, 250T, 40T cranes dismantling and reassembly
- 1100 kw of Tunnel ventilation
- Tunnelling Industrial and potable water pump systems and controls
- Project wide site emergency lighting, site flood lighting to meet AS3012 requirements.
- 3 x 1MVA Integrated back up generator systems
- 8 x 180kw compressor stations to support TBM compressed air interventions
- Provide a support team during compressed air interventions
- Construction wiring throughout the tunnel sites and Tunnel including all underground lighting, evacuation system, Construction boards, Test and tag.
- Installation of permanent MEI cable ladder and conduits
- Installation of site fibres, IT network and WIFI systems
- Installation of 24 km of underground leaky feeder systems and P25 motorola emergency services radio network
- Tunnelling site dewater system and water treatment plants
- Providing highly skilled Shift technicians for Herrenknecht 15 meter tunnelling machine assembly and build. Our experienced electricians were responsible for wiring, testing and commissioning the Westgate Tunnel Boring machines with Herrenknecht technicians.
- Provide Shift maintenance technicians for support during tunnel excavation, assembly and disassembly of the Tunnelling machines.
We have allocated electricians to this project to work on a 24/7 shift basis.
Read more
We have worked collaboratively on:
- All site establishment works which include all crib and site amenities, 300 person project office complex and community centre, 24,000 m2 spoil shed, bath house and laundry.
- Installation and wiring of 2 x 15meter Herrenknecht Tunnel boring machines
- 20 Mva of installed TBM power and 6 Mva of installed TBM services power
- Installation and management of site High Voltage reticulation systems
- 600m x1.8m dia pipejack drive Pipe jack and slurry plant assembly, disassembly and 24hr/7 day electrical shift maintenance.
- 6km Martitechnik Tunnel conveyor, loop take up and overland conveyor systems
- 3 x Eilbeck 500T, 250T, 40T cranes dismantling and reassembly
- 1100 kw of Tunnel ventilation
- Tunnelling Industrial and potable water pump systems and controls
- Project wide site emergency lighting, site flood lighting to meet AS3012 requirements.
- 3 x 1MVA Integrated back up generator systems
- 8 x 180kw compressor stations to support TBM compressed air interventions
- Provide a support team during compressed air interventions
- Construction wiring throughout the tunnel sites and Tunnel including all underground lighting, evacuation system, Construction boards, Test and tag.
- Installation of permanent MEI cable ladder and conduits
- Installation of site fibres, IT network and WIFI systems
- Installation of 24 km of underground leaky feeder systems and P25 motorola emergency services radio network
- Tunnelling site dewater system and water treatment plants
- Providing highly skilled Shift technicians for Herrenknecht 15 meter tunnelling machine assembly and build. Our experienced electricians were responsible for wiring, testing and commissioning the Westgate Tunnel Boring machines with Herrenknecht technicians.
- Provide Shift maintenance technicians for support during tunnel excavation, assembly and disassembly of the Tunnelling machines.