M Squared Infrastructure has been a key partner in supporting CPBJH on the Westgate Tunnel Project.
M Squared Electrical has collaborated with CPB-JH on the West Gate Tunnel project, working collaboratively across multiple facets of site establishment, tunnelling, and electrical infrastructure.
As the contractor of choice for CPBJH, we have played a key role in:
- Site establishment
- Tunnel Boring Machine (TBM) assembly and disassembly
- TBM ancillary services installation
- Machinery maintenance
WHAT
Site establishment and infrastructure have been completed.
Read more
- Complete site establishment, including:
- Crib and site amenities
- 300-person project office complex & community centre
- 24,000 m² spoil shed, bathhouse, and laundry
- Installation and wiring of two 15-meter Herrenknecht Tunnel Boring Machines (TBMs)
- 20 MVA installed TBM power
- 6 MVA installed TBM services power
- Installation and management of High Voltage (HV) reticulation systems
- 600m x 1.8m diameter pipejack drive – pipejack & slurry plant assembly, disassembly, and 24/7 electrical maintenance
- 6km Marti Technik Tunnel conveyor system, including loop take-up and overland conveyor systems
- Dismantling and reassembly of three Eilbeck cranes (500T, 250T, 40T)
- 1,100 kW Tunnel Ventilation System
- Industrial & potable water pump systems and controls
- Project-wide emergency lighting & flood lighting, ensuring compliance with AS3012 requirements
- Installation of three 1MVA integrated backup generator systems
- Eight 180kW compressor stations to support TBM compressed air interventions
- On-site support teams for compressed air interventions
- Tunnelling & Electrical Installations
- Construction wiring throughout tunnel sites, including:
- Underground lighting & evacuation systems
- Construction boards, test & tag services
- Installation of permanent MEI cable ladder & conduit systems
- Deployment of site fibre, IT networks, and Wi-Fi systems
- Installation of 24 km underground leaky feeder systems and P25 Motorola emergency services radio network
- Tunnelling site dewatering systems & water treatment plants

WHAT
Site establishment and infrastructure have been completed.
Read more
- Complete site establishment, including:
- Crib and site amenities
- 300-person project office complex & community centre
- 24,000 m² spoil shed, bathhouse, and laundry
- Installation and wiring of two 15-meter Herrenknecht Tunnel Boring Machines (TBMs)
- 20 MVA installed TBM power
- 6 MVA installed TBM services power
- Installation and management of High Voltage (HV) reticulation systems
- 600m x 1.8m diameter pipejack drive – pipejack & slurry plant assembly, disassembly, and 24/7 electrical maintenance
- 6km Marti Technik Tunnel conveyor system, including loop take-up and overland conveyor systems
- Dismantling and reassembly of three Eilbeck cranes (500T, 250T, 40T)
- 1,100 kW Tunnel Ventilation System
- Industrial & potable water pump systems and controls
- Project-wide emergency lighting & flood lighting, ensuring compliance with AS3012 requirements
- Installation of three 1MVA integrated backup generator systems
- Eight 180kW compressor stations to support TBM compressed air interventions
- On-site support teams for compressed air interventions
- Tunnelling & Electrical Installations
- Construction wiring throughout tunnel sites, including:
- Underground lighting & evacuation systems
- Construction boards, test & tag services
- Installation of permanent MEI cable ladder & conduit systems
- Deployment of site fibre, IT networks, and Wi-Fi systems
- Installation of 24 km underground leaky feeder systems and P25 Motorola emergency services radio network
- Tunnelling site dewatering systems & water treatment plants
WHAT
Our commitment to quality, safety, and efficiency ensures smooth project execution while minimising downtime.
Read more
Project Statistics
- $15 billion mega-project
- 6 km of tunnels
- 20 MW of installed excavation equipment
Specialised Technical Expertise
Shift Technicians for Herrenknecht 15-meter TBM assembly, wiring, testing, and commissioning alongside Herrenknecht technicians.
Shift Maintenance Technicians supporting:
- Tunnel excavation
- Assembly & disassembly of TBMs
- Back-end works for 10 Euroform backup gantries, including:
- Robotic drill rigs (scabbling & drilling gantries)
- Reinforcement & corbel casting gantries
- MEI permanent cable ladder, drainage, fire & dewatering systems installation
- Road deck plank installation gantry
- CREG Cross Passage Machines:
- 21 assemblies & 21 disassembly’s
- Modifications, instrumentation testing, commissioning, and maintenance
- Permanent Works & Project Support
- High Voltage (HV) earthing
- Reinforcement earth bonding
- Pit & conduit installation
- Cable ladder installations

WHAT
Our commitment to quality, safety, and efficiency ensures smooth project execution while minimising downtime.
Read more
Project Statistics
- $15 billion mega-project
- 6 km of tunnels
- 20 MW of installed excavation equipment
Specialised Technical Expertise
Shift Technicians for Herrenknecht 15-meter TBM assembly, wiring, testing, and commissioning alongside Herrenknecht technicians.
Shift Maintenance Technicians supporting:
- Tunnel excavation
- Assembly & disassembly of TBMs
- Back-end works for 10 Euroform backup gantries, including:
- Robotic drill rigs (scabbling & drilling gantries)
- Reinforcement & corbel casting gantries
- MEI permanent cable ladder, drainage, fire & dewatering systems installation
- Road deck plank installation gantry
- CREG Cross Passage Machines:
- 21 assemblies & 21 disassembly’s
- Modifications, instrumentation testing, commissioning, and maintenance
- Permanent Works & Project Support
- High Voltage (HV) earthing
- Reinforcement earth bonding
- Pit & conduit installation
- Cable ladder installations